Tasmanian Transport Museum

As part of the testing of DP15 after its overhaul, a number of test runs were also performed with DP26 to confirm their ability to operate satisfactorily as a pair when required. These units have operated together at the museum on various special occasions in the past but it is through to have been 15 to 20 years since this had occurred. August 2014
As part of the testing of DP15 after its overhaul, a number of test runs were also performed with DP26 to confirm their ability to operate satisfactorily as a pair when required. These units have operated together at the museum on various special occasions in the past but it is through to have been 15 to 20 years since this had occurred. August 2014
Photographer: Stuart Dix


This image is used on the following pages:


Back


Page last updated: April 20, 2020, 09:22:12
Page URL: http:// railtasmania.com/photogal/showimage.php?id=940
All content of this site is copyright ©
Please contact us if you have problems with the site or want more information