On 12 January 2014, new locomotives TR04 and TR01 started a series of tests on the between Colebrook and Parattah. Prior to departure from Brighton, the four locos are pictured moving from the quick fix shed to the train, and then later in the day passing through Campania. In addition to the two locos under test, 2054 and DQ2006 were attached idling as backup, whilst Y2151 was dead attached as part of the load, which primarily comprised loaded coal and paper wagons
Photographer: Stuart Dix